Safety Alerts / Rail Safety Notices

About Us

Resources

General Information

RSN - 2012 - 07 Risks Associated with Hirail Operations, (PDF)

RSN - 2012 - 06 Fatal Accident During Shunting, (PDF)

RSN - 2012 - 05 Train Brake Pipe Obstructions - Flexible Airbrake Hose, (PDF)

RSN - 2012 - 04 Axle Defects, (PDF)

RSN - 2012 - 03 Investigation Reports Track Worker Fatalities NSW, (PDF)

RSN - 2012 - 02 Inadequate Safety Management Systems (Tourist & Heritage Railways)

RSN - 2012 - 01 Safe Working Procedures, (PDF)

RSN - 2011 - 04 Axle Failure, (PDF)

RSN - 2011 -03 Hi-Rail Excavator, (PDF)

RSN - 2011 - 02 Roller Bearing Failure, (PDF)

RSN - 2011 - 01 Effective Securement with Handbrakes and Stopblock Functionality, (PDF)

RSN - 2010 - 02 Securing Seating & Equipment in Passenger Carriages, (PDF)

RSN - 2010 - 01 Risks at Level Crossings, (PDF)

Notice No 4/2009 Cable Insulation, (PDF)

Notice No 3/2009 Ballast Regulator Collision, (PDF)

Notice No 2/2009 Plasser 09-16 Dual Cab Continuous Action Tamper - Breaking System Failure, (DPF)

Notice No 1/2009 Rolling Stock Underframe Mounted Equipment, (PDF)

Notice No 2/2007 Warning of Potential Wagon Headstock Carrier Plate Asbestos Material, (PDF)

Notice No 1/2007 Suspect Bogie Side Bearer Fibrous Wear Pads, (PDF)

Notice No: RSN 2006-01: Road/Rail Vehicles - Inspecting Wagons while Shunting Movements Occurring.  Issued 15 September 2006, (PDF)

Notice No: RSN 2005-01: Road/Rail Vehicles - Faulty rear track guidance system.  Issued 21 November 2005, (PDF)

Notice No: RSN 2004-02: Locomotive Underframe Bolster Cracking.  Issued: 13 July 2004, (PDF)

Notice No: RSN 2004-01: Self Restoring Switch - Malfunction.  Issued 13 July 2004, (PDF)